Steam Turbine Control System Retrofit ICS

innovative control systems, inc.

Owner:
TransCanada Pipelines LTD
Location:
Williams Lake, BC, Canada
Contractor:
 
Completed:
June 2003
Equipment:
1 x 68MW Steam Turbine Generator Package
Model:
GE Steam Turbine Generator

TransCanada’s Williams Lake Power Plant is North America’s largest Biomass fueled generating station. The plant uses 600,000 tons of waste wood annually to generate 68+ Megawatts of electricity using a GE Steam Turbine. TCPL elected to replace the existing GE Mark III+ control system on the turbine with a new system to increase the availability of parts and service. ICS was awarded a contract for replacement of the GE Mark III+ control system with a new STC2000 system.

TCPL scheduled a five week outage in order to perform a mechanical overhaul of the turbine. ICS delivered the control system upgrade package to support the scheduled outage. The ICS upgrade package included:

  • STC2000 Steam Turbine Controller as a direct replacement for the existing GE Mark III+ controller.
  • Autosynchronizer
  • Vibration Monitor with stand-alone protection and status input into the PLC.
  • Interface to existing Plant DCS system
  • Fast-Track Project (Approx. 3 months from start of engineering to unit commissioned)
  • Installation, Loop-Check and Commissioning Site Services

In addition to equipment and services, ICS provided a full engineering package including Control System Schematics, Demolition and Installation Instructions and a complete as-built documentation package. The project was completed on-schedule in June 0f 2003.



Home | Company | Business Activities | Turbomachinery Upgrades | HRSG/BOP | News | Site Map | Contact Us

Innovative Control Systems, Inc. - Turbine Control Solutions Emerson Process Management | Power & Water Solutions | Innovative Control Systems
26 Corporate Drive | Clifton Park, NY 12065 USA
1. 518. 383. 8078 Phone | 1. 518. 383. 5966 Fax
© Copyright 2010